Full bathroom & ensuite renovations · Waterproofing & accessible bathrooms · Geelong, Bellarine & Surf Coast · Call (03) 9022 1391
Before you sign

A safe Geelong bathroom quote states scope, allowances, certificates and deposits

A proper bathroom renovation quote in Geelong should be itemised enough that you can see the waterproofing, plumbing, electrical, tile area, fixtures, GST, exclusions and payment stages. In Victoria, deposits are capped at 10 percent under $20,000 and 5 percent at $20,000 or more.

Quote basics

Waterproofing, plumbing & electrical

Allowances & exclusions

Registration, insurance & contract

Red flags - walk away if you see these

How to read three bathroom quotes side by side

Do not start with the final number. Start by lining up the inclusions. A $31,000 quote that includes demolition, AS 3740 waterproofing, a $4,500 fixture allowance, 30 m² of tiling, licensed trades and rubbish removal may be better value than a $25,000 quote that leaves those items vague.

In Geelong, Newtown, Belmont and Highton, many bathrooms are in older timber-framed or brick veneer homes. Once the old shower is stripped, the common surprises are rotten particleboard flooring, bottom plate decay, out-of-square walls and old plumbing that should not be buried behind new tiles. In Armstrong Creek and newer Grovedale homes, the risk is less about age and more about slab waste locations, tile set-downs and whether the original waterproofing was done neatly.

A compliant written quote should state the work, materials, allowances, GST, exclusions, start timing, payment stages and certificate handover. It should make clear whether the toilet stays in place, whether the shower drain moves, whether electrical circuits are new or reused, and whether the builder is pricing floor-to-ceiling tiling or wet-area-only tiling. For more context on full scope, see our full bathroom renovation, ensuite renovation, laundry renovation and pricing pages.

What is usually excluded and later charged as a variation

The fairest quote in the world cannot see through tiles. What matters is whether the unknowns are named upfront. Common bathroom variations include asbestos testing and removal, replacing rotten flooring, repairing studs, levelling old floors, changing a toilet waste through concrete, upsizing a fan duct, adding switchboard capacity for underfloor heating, or replacing plumbing that fails once disturbed.

A realistic quote should give either a provisional sum or a clear hourly rate. For example, builder variation labour might be $85 to $125 per hour, plumbing $110 to $170 per hour, electrical $100 to $160 per hour, and tiling $90 to $140 per hour plus materials. If a quote says "variations as required" but gives no rates, you cannot compare it properly.

Want us to sanity-check a quote? Send the scope and we can tell you whether the missing items are normal, risky or expensive.

☎ Call (03) 9022 1391

Deposit limits and registration checks in Victoria

For Victorian domestic building work, deposits are capped. The practical rule for homeowners is simple: 10 percent maximum if the total contract is under $20,000, and 5 percent maximum if the total contract is $20,000 or more. A $42,000 bathroom should not require $15,000 upfront. Staged payments should match real milestones such as contract signing, rough-in, waterproofing, tiling and completion.

Use the Building and Plumbing Commission's practitioner search before signing. Bathroom, kitchen and laundry renovation work sits within domestic building registration classes, and plumbing work needs a registered or licensed plumber. Ask for the registration number, check that it is current, and check that the person or company on the quote is the same as the person or company on the register.

An honest constraint: the cheapest quote can be the right quote when the job is genuinely small. If you only need a vanity swap, new mirror and fan replacement, you may not need a full renovator managing a major project. If you have leaking tiles, drainage changes or a second-storey ensuite, paying for proper coordination is usually cheaper than paying twice.

Get a price

Compare your Geelong bathroom quote with ours

Send your suburb and scope and we will reply within 1 business day with a clear next step or a fixed quote appointment.

We reply within 1 business day. Free, no obligation.

Quote comparison questions

How many bathroom renovation quotes should I compare in Geelong?
Compare 2 or 3 itemised quotes, not 5 vague ones. For a $25,000 to $45,000 bathroom, the useful comparison is waterproofing, plumbing, tile allowance, fixture allowance, demolition and exclusions. If one quote is $8,000 below the others, look for missing scope before assuming it is better value.
What deposit can a Victorian bathroom renovator ask for?
For domestic building work in Victoria, Consumer Affairs Victoria says the deposit cap is 10 percent if the contract is less than $20,000 and 5 percent if it is $20,000 or more. A $32,000 bathroom contract should not need a $10,000 deposit. Progress payments should match completed stages, not the builder's cash flow.
What should a compliant written bathroom quote include?
A useful quote should state the exact room, demolition scope, plumbing moves, electrical points, waterproofing system, tile area in square metres, fixture allowances, rubbish removal, certificates and GST. It should also say what is excluded, because asbestos, rotten framing, engineering and client-supplied fittings can add $600 to $6,000 or more. If the quote is one page and mostly adjectives, it is not enough for a wet-area job.
How do I check a bathroom renovator registration in Victoria?
Use the Building and Plumbing Commission Find and check a practitioner search for the builder, plumber or building practitioner. Work worth more than $10,000 generally needs the right registered practitioner, and plumbing work needs a registered or licensed plumber. Ask for the registration number in writing and make sure the name on the quote matches the register.
What exclusions cause the most bathroom quote variations?
The common variation items are asbestos removal, wet rot, termite-damaged bottom plates, slab chasing, extra tile area, out-of-level floors and client fixture changes. A fair quote will list these as possible extras with hourly rates or provisional sums. In Geelong homes from the 1950s to 1980s, hidden water damage around showers is one of the most common $1,500 to $7,000 surprises.
Is the cheapest bathroom quote ever the right choice?
Sometimes, but only when the inclusions are genuinely the same and the builder has explained how they keep cost down. A cheaper quote can be right for a cosmetic refresh that keeps plumbing in place and uses standard fixtures. It is risky for a leaking bathroom, a second-storey ensuite or any job where waterproofing, falls and certificates are unclear.
Call (03) 9022 1391